Copyright © 2023. All rights reserved. Designed By Future Technologies
Eurolink Carz has provided the list below for you to get an approximate freight, for example, from Nagoya, Japan to your destination. The total amount you would incur for freight can be calculated by using the following formula: Meter (m3) of the Car X the Shipping Rate (USD per m3).
Example – 1 : Toyota Corolla shipped to Dar Es Salaam, Tanzania.
11m3 X US$115 = US$1265
Example – 2 : Toyota Vitz shipped to Yangon, Myanmar.
9m3 X US$95 = US$855
| Size of Vehicle | Car’s Name (Examples) | Cubic Meter (m3) |
|---|---|---|
| Small | Starlet / MR2 / March etc. | 9 m3 |
| Medium | Corolla / Corona etc. | 11 m3 |
| Large | Crown / Soarer etc. | 13 m3 |
| Medium LWB RV Car | Hilux / Terrano etc. | 14-16 m3 |
| Large LWB RV Car | Pajero / Land Cruiser etc. | 16-18 m3 |
| Wagon | Hiace / Caravan etc. | 16 m3 |
| Van | Hiace / Caravan etc. | 15-19 m3 |
| Port | Rates | RO-RO Rate | Container Rate | Ship Time |
|---|---|---|---|---|
| Acajutla | Per M3 | US$ 115 | – | – |
| Adelaide | Fixed | US$ 115 | – | 16-26 Days |
| Aktau | Per M3 | US$ 102 | US$ 10 (20ft.) US$ 50 (40ft.) | 10-20days |
| Alexandria | Per M3 | US$ 95 | – | 21-30 Days |
| Amsterdam | Per M3 | US$ 98 | – | 35-42 Days |
| Antwerpe | Per M3 | US$ 90 | – | 30-36 Days |
| Apia | Per M3 | US$ 191 | – | 20-26 Days |
| Aqaba | Per M3 | US$ 160 | – | 24-33 Days |
| Aruba | Per M3 | US$ 150 | – | – |
| Auckland | Fixed | 1~19.99 M3 = US$ 1,300 20~29.99 M3 = US$ 1,500 30~39.99 M3 = US$ 1,800 40~49.99 M3 = US$ 2,000 50~59.99 M3 = US$ 2,500 | US$ 1,800 (20ft.) | 14-26 Days |
| Bahrain | Per M3 | US$ 70 | – | 23-30 Days |
| Balboa | Per M3 | US$ 140 | – | 24-36 Days |
| Baltimore | Per M3 | US$ 115 | – | 34-46 Days |
| Barcelona | Per M3 | US$ 95 | – | 36-43 Days |
| Basseterre | Per M3 | US$ 155 | – | 30-45 Days |
| Batumi | Per M3 | US$ 115 | – | 34-46 Days |
| Beirut | Per M3 | US$ 95 | – | 34-46 Days |
| Bissau | Per M3 | US$ 159 | – | – |
| Bonaire | Per M3 | US$ 155 | – | 40-45 Days |
| Bremerhaven | Per M3 | US$ 98 | – | 35-42 Days |
| Bridgetown | Per M3 | US$ 160 | – | 40-45 Days |
| Brisbane | Fixed | US$ 85 | – | 16-26 Days |
| Bristol | Per M3 | US$ 130 | – | 26-36 Days |
| Buenaventura | Per M3 | US$ 113 | – | 39-46 Days |
| Busan | Per M3 | US$ 70 | – | – |
| Caldera | Per M3 | US$ 155 | – | 14-26 Days |
| Cartagena | Per M3 | US$ 155 | – | 39-46 Days |
| Castries | Per M3 | US$ 150 | – | 40-45 Days |
| Chittagong | Per M3 | US$ 55 | – | 20-25 Days |
| Chuuk | Per M3 | US$ 170 | – | 25-30 Days |
| Conakry | Per M3 | US$ 200 | – | 34-46 Days |
| Copenhagen | Per M3 | US$ 120 | – | – |
| Corinto | Per M3 | US$ 121 | – | – |
| Cotonou | Per M3 | US$ 200 | – | 34-46 Days |
| Curacao | Per M3 | US$ 160 | – | 40-45 Days |
| Dakar | Per M3 | US$ 135 | – | 34-46 Days |
| Dammam | Per M3 | US$ 80 | – | 38-48 Days |
| Dar Es Salaam | – | 1~199 M3 = US$ 100 200~225 M3 = US$ 110 226~275 M3 = US$ 125 276~400 M3 = US$ 155 | – | 24-36 Days |
| Derince | Per M3 | US$ 110 | – | 29-36 Days |
| Dili | Per M3 | US$ 200 | – | 20-28 Days |
| DJIBOUTI | Per M3 | US$ 170 | – | 21-30 Days |
| Doha | Per M3 | US$ 74 | – | 20-29 Days |
| Douala | Per M3 | US$ 190 | – | – |
| Drammen | Per M3 | US$ 125 | – | 45-50 Days |
| Dubai | Per M3 | US$ 77 | – | 38-48 Days |
| Dublin | Per M3 | US$ 136 | – | 26-36 Days |
| Durban | – | 1~199 M3 = US$ 105 200~399 M3 = US$ 115 400~899 M3 = US$ 130 900~1399 M3 = US$ 155 1400~1599 M3 = US$ 175 1600~1999 M3 = US$ 200 | – | 24-36 Days |
| Fort De France | Per M3 | US$ 160 | US$ 2,500 (20ft.) US$ 3,900 (40ft.) | 40-45 Days |
| Fredericia | Per M3 | US$ 120 | – | 26-36 Days |
| Freeport | Per M3 | US$ 150 | – | 25-40 Days |
| Fremantle | Fixed | US$ 115 | – | 16-26 Days |
| Funafuti | Per M3 | US$ 610 | – | – |
| Gdansk | Per M3 | US$ 130 | – | 33-40 Days |
| Gdynia | Per M3 | US$ 140 | – | 33-40 Days |
| Georgetown (Cayman Islands) | Per M3 | US$ 160 | – | 40-50 Days |
| Georgetown (Guyana) | Per M3 | US$ 210 | US$ 9,000 (40ft.) | 40-50 Days |
| Gothenburg | Per M3 | US$ 95 | – | 36-46 Days |
| Grand Cayman | Per M3 | US$ 155 | – | 29-36 Days |
| Grimsby | Per M3 | US$ 130 | – | – |
| Guam | Per M3 | US$ 120 | – | 12-18 Days |
| Guanta | Per M3 | US$ 190 | – | – |
| Halifax | Per M3 | US$ 130 | – | 9-16 Days |
| Hambantota | Per M3 | US$ 75 | – | 14-26 Days |
| HAMBURG | Per M3 | US$ 98 | – | 35-42 Days |
| Hamilton | Per M3 | US$ 155 | – | 24-36 Days |
| Hanko | Per M3 | US$ 115 | – | 26-36 Days |
| Hodeidah | Fixed | – | US$ 2,595 (20ft.) | – |
| Hong Kong | Fixed | 0~11.99 M3 = US$ 420 12~14.99 M3 = US$ 450 15~25 M3 = US$ 500 | US$ 3,600 (20ft.) US$ 5,500 (40ft.) | 11-16 Days |
| Honiara | Per M3 | US$ 220 | – | 14-20 Days |
| Honolulu | Per M3 | – | – | 9-18 Days |
| Illichivsk | Per M3 | US$ 140 | – | – |
| Iquique | Fixed | 1~13.99 M3 = US$ 850 14~19.99 M3 = US$ 1,050 20~29.99 M3 = US$ 1,400 30~9999 M3 = US$ 2,315 | – | 24-36 Days |
| Izmir | Per M3 | US$ 110 | – | 29-36 Days |
| Jacksonville | Per M3 | US$ 115 | – | 34-46 Days |
| Jakarta | Per M3 | US$ 90 | – | 11-23 Days |
| Jebel Ali | Per M3 | US$ 74 | – | 38-48 Days |
| Karachi | Per M3 | US$ 110 | – | 14-26 Days |
| Kelang | Per M3 | US$ 120 | – | 9-15 Days |
| Kembla | Per M3 | US$ 85 | – | 16-26 Days |
| Kingston | Per M3 | US$ 100 | – | 24-36 Days |
| Kingstown | Per M3 | US$ 150 | – | 40-50 Days |
| Klaipeda | Fixed | – | – | – |
| Kolkata | Per M3 | US$ 111 | – | 21-26 Days |
| Koror | Per M3 | US$ 175 | – | 17-26 Days |
| Kosrae Island | Per M3 | US$ 170 | – | 34-46 Days |
| Kuwait | Per M3 | US$ 80 | – | 6-8 Weeks |
| LA Guaira | Per M3 | US$ 185 | – | – |
| Lae | Per M3 | US$ 188 | – | 34-46 Days |
| Laemchabang | Per M3 | US$ 60 | – | 8-17 Days |
| Larnaca | Per M3 | US$ 96 | – | 26-36 Days |
| Lautoka | Per M3 | US$ 146 | – | 36-46 Days |
| Le Havre | Per M3 | US$ 180 | US$ 1,900 (20ft.) US$ 2,600 (40ft.) | 45-50 Days |
| Le Havre | Per M3 | US$ 180 | US$ 1,900 (20ft.) US$ 2,600 (40ft.) | 45-50 Days |
| Libreville | Per M3 | US$ 220 | – | 34-46 Days |
| Limassol | Per M3 | US$ 90 | – | 26-36 Days |
| Liverpool | Per M3 | US$ 130 | – | 26-36 Days |
| Livorno | Per M3 | US$ 95 | – | 27-26 Days |
| Lome | Per M3 | US$ 165 | – | 34-46 Days |
| Long Beach | Per M3 | US$ 115 | – | 9-18 Days |
| Louis | Per M3 | US$ 110 | – | 19-26 Days |
| Luanda | Per M3 | US$ 115 | – | 26-34 Days |
| Lyttelton | Fixed | 1~19.99 M3 = US$ 750 20~29.99 M3 = US$ 1,008 30~39.99 M3 = US$ 1,270 40~49.99 M3 = US$ 1,824 50~59.99 M3 = US$ 2,278 | – | 14-26 Days |
| Madang | Per M3 | US$ 156 | – | 34-46 Days |
| Mahe | Per M3 | – | US$ 4,500 (20ft.) US$ 8,500 (40ft.) | 45-50 Days |
| Majuro | Per M3 | US$ 160 | – | – |
| Male | Per M3 | – | US$ 4,500 (20ft.) US$ 6,100 (40ft.) | 30-39 Days |
| Malmo | Per M3 | US$ 120 | – | 36-46 Days |
| Manila | Per M3 | US$ 65 | – | 5-10 Days |
| Manzanillo | Per M3 | US$ 125 | – | – |
| Maputo | – | 1~199 M3 = US$ 116 200~229 M3 = US$ 127 230~279 M3 = US$ 133 280~400 M3 = US$ 155 | – | 29-36 Days |
| Matarani | Fixed | 1~9999 M3 = US$ 2,095 | US$ 2,200 (20ft.) US$ 3,600 (40ft.) | 24-36 Days |
| Melbourne | Fixed | US$ 105 | – | 16-26 Days |
| Misawa | Per M3 | US$ 100 | – | – |
| Mombasa | – | 1~199 M3 = US$ 100 200~225 M3 = US$ 110 226~275 M3 = US$ 125 276~400 M3 = US$ 155 | – | 24-34 Days |
| Monrovia | Per M3 | US$ 190 | – | 39-51 Days |
| Moresby | Per M3 | US$ 188 | – | 34-46 Days |
| Muara | Fixed | 0~9999 M3 = US$ 1,130 | US$ 1,800 (20ft.) | 15-22 Days |
| Mumbai | Per M3 | US$ 135 | – | 21-26 Days |
| Nassau | Per M3 | US$ 125 | – | 25-35 Days |
| Nelson | Fixed | 1~19.99 M3 = US$ 750 20~29.99 M3 = US$ 1,008 30~39.99 M3 = US$ 1,270 40~49.99 M3 = US$ 1,824 50~59.99 M3 = US$ 2,278 | – | 14-26 Days |
| New Westminster | Per M3 | US$ 120 | – | 9-16 Days |
| New York | Per M3 | US$ 115 | – | 9-18 Days |
| Newcastle | Per M3 | US$ 130 | – | 26-36 Days |
| Nouakchott | Per M3 | US$ 185 | – | 34-46 Days |
| Noumea | Per M3 | US$ 220 | – | 34-46 Days |
| Nukualofa | Per M3 | US$ 180 | – | 30-35 Days |
| Odessa | Per M3 | US$ 140 | – | – |
| Pago Pago | Per M3 | US$ 412 | – | 35-45 Days |
| Paldiski | Per M3 | US$ 115 | – | 36-42 Days |
| Papeete | Per M3 | US$ 226 | – | 21-31 Days |
| Paramaribo | Per M3 | US$ 125 | – | 39-46 Days |
| Philipsburg | Per M3 | US$ 160 | – | 40-45 Days |
| Piraeus | Per M3 | US$ 90 | – | – |
| Pohnpei | Per M3 | US$ 170 | – | 34-46 Days |
| Pointe a Pitre | Per M3 | US$ 160 | – | – |
| Port Au Prince | Per M3 | US$ 165 | – | 17-26 Days |
| Port Castries | Per M3 | US$ 150 | – | 40-45 Days |
| Port Irene | Per M3 | US$ 80 | – | 5-10 Days |
| Port Kembla | Fixed | 1~19.99 M3 = US$ 1,700 20~29.99 M3 = US$ 2,300 30~39.99 M3 = US$ 3,200 | – | 16-26 Days |
| Port Louis | – | 1~154 M3 = US$ 81 155~199 M3 = US$ 91 200~239 M3 = US$ 101 240~400 M3 = US$ 111 | – | 30-35 Days |
| Port Of Spain | Per M3 | US$ 115 | – | 24-36 Days |
| Port Sudan | Per M3 | US$ 90 | – | 29-38 Days |
| Port Vila | Per M3 | US$ 230 | – | – |
| Poti | Per M3 | US$ 115 | – | 34-46 Days |
| Providenciales | Per M3 | US$ 300 | – | 28-39 Days |
| Puerto Cabello | Per M3 | US$ 200 | – | – |
| Puerto Sucre | Per M3 | US$ 210 | – | – |
| Quetzal | Per M3 | US$ 185 | – | 24-36 Days |
| Rabaul | Per M3 | US$ 194 | – | 34-46 Days |
| Reykjavik | Per M3 | US$ 210 | – | – |
| Roseau | Per M3 | US$ 155 | – | 24-36 Days |
| Rotterdam | Per M3 | US$ 110 | – | 35-42 Days |
| San Juan | Per M3 | US$ 105 | – | – |
| San Lorenzo | Per M3 | US$ 100 | – | 37-46 Days |
| Santander | Per M3 | US$ 95 | – | 36-43 Days |
| Santo Domingo | Per M3 | US$ 145 | – | 24-36 Days |
| Santos | Per M3 | US$ 230 | – | 37-46 Days |
| Savannah | Per M3 | US$ 130 | – | 34-46 Days |
| Savona | Per M3 | US$ 155 | – | 27-26 Days |
| sdf | Per M3 | – | – | – |
| Sharjah | Per M3 | US$ 77 | – | 38-48 Days |
| Sihanoukville | Per M3 | US$ 150 | – | – |
| Singapore | Fixed | 0~13.99 M3 = US$ 550 14~20 M3 = US$ 650 | – | 9-16 Days |
| Sohar | Per M3 | US$ 80 | – | 29-34 Days |
| Southampton | Per M3 | US$ 125 | – | 26-36 Days |
| St. Georges | Per M3 | US$ 160 | – | 24-41 Days |
| St. Johns | Per M3 | US$ 165 | – | 24-36 Days |
| St. Petersburg | Per M3 | US$ 110 | – | 4-6 Days |
| Sultan Qaboos | Per M3 | US$ 73 | – | 29-34 Days |
| Suva | Per M3 | US$ 145 | – | 36-46 Days |
| Tacoma | Per M3 | US$ 115 | – | 9-18 Days |
| Taipei | Per M3 | US$ 60 | – | – |
| Tamatave | Per M3 | US$ 135 | – | 34-46 Days |
| Tarawa | Per M3 | US$ 270 | – | 14-26 Days |
| Tema | Per M3 | US$ 200 | – | 34-46 Days |
| Townsville | Per M3 | US$ 115 | – | 16-26 Days |
| Turku | Per M3 | US$ 115 | – | 26-36 Days |
| Valetta | Per M3 | US$ 105 | – | 26-33 Days |
| Valparaiso Port | Fixed | 1~999.99 M3 = US$ 2,645 | US$ 1,600 (20ft.) US$ 3,600 (40ft.) | – |
| Vancouver | Per M3 | US$ 120 | – | 9-16 Days |
| Vladivostok | Per M3 | 0~9999 M3 = US$ 400 | – | 4-6 Days |
| Walvis Bay | Fixed | 1~119 M3 = US$ 6,600 | – | 50-60 Days |
| Wellington | Fixed | 1~19.99 M3 = US$ 750 20~29.99 M3 = US$ 1,008 30~39.99 M3 = US$ 1,270 40~49.99 M3 = US$ 1,824 50~59.99 M3 = US$ 2,278 | US$ 1,800 (20ft.) | 14-26 Days |
| Xingang | Per M3 | US$ 45 | – | 10-15 Days |
| Yangon | Per M3 | US$ 50 | – | 13-22 Days |
| Yap | Per M3 | US$ 170 | – | 34-46 Days |
| Yokota | Per M3 | US$ 100 | – | – |
| Zeebrugge | Per M3 | US$ 90 | – | – |